Staten Island Port Richmond
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 15, 2023 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULLY DEMOLISH THE 3 STORY PLUS CELLAR BUILDING AND GRADE SITE. NOTE, THE 1 STORY GARAGE SHALL REMAIN |
| Feb 14, 2023 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROX.40 LINEAR FEET OF TIGHT BOARD FENCE ALONG EXP#1 AND #3, AND APPROXIMATELY 120 LINEAR FEET ALONG EXPOSURES #2 AND #4 SECURE THE UNSAFE BUILDING FROM UNAUTHORIZED ACCESS. APPROXIMATELY 320 LINEAR FEET OF TOTAL TIGHT BOARD FENCE |
| Feb 10, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM+FULL VACATE.BLDG WAS VACANT,OPEN&IN STATE OF DISREPAIR EXP1 WALL PRTLLY DETACHED&@RISK OF CLLPSE.1ST FL JOISTS PRTLLY DTACHED.EXP3 WALL STUDS PRTLLY DTACHED/DETERIORATED.BLDG UNSFE TO OCCPY.FULLY VACATE THE BLDG UNTIL HAZARDOUS CNDITIONS ARE REMEDIED RPAIR OR DEMO BLDG IMMED UNDR PRMT.CRDNATE W/SEPRTE EMER.DEC |
| Dec 14, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR THE FENCE ENCLOSING THE ENTRIES PREMISES |
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Aug 9, 2013 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |