Staten Island St. George-New Brighton
99-103 Stuyvesant Pl, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 5, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 22, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE COND.ON 6/6/18,BLDG DAMAGE IN FIRE.IN 97,MINOR DAMAGE TO INT FINISH.IN 99,MODERATE DAMAGE TO INT FINISH,CEIL FINISH COLL, CHARRED ROOF JOISTS,OPNGS IN EXT WALLS.IN 103,DAMAGE INT FINISH.CEIL FINISH COLL,COLL OF 1STFL @REAR OF BLDG.REMEDY:OWN HAVE PE EVAL BLDG& DEVELOP REMED PLAN/WRK PLAN.OBT PERM BY 7/30/18.BEG WRK BY 8/13/18 |
| Jun 7, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.1S+B ATTACH COMM BLDG ON INT LOT DAMAGED BY FIRE ON 6/6/18 AT 97,MINOR DAMAGE TO INT FINISH @LOT FL.@99,MOD DAMAGE TO INT FINISH, CEIL FINISH COLL,CHARRED ROOF FRAMING.@103,DAMAGED INT FINISH,COLL OF 1STFL@REAR OF BLDG.REMEDY:INSTALL TEMP SHOR AS REQ'D.CLEAR FIRE DEBRIS FILE APP FOR WRK W/2BUS DAYS.NYSPE EVAL BLDG FOR STAB&PERM RPRS |
| Jun 6, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 6, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |