4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 22, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | AT EXP#1 ERECT APPROX. 28 FT OF CONTRUCTION FENCE WHICH CONTINUES WITH THE ADJACENT PROPERTY (827) & EXTEND AT EXP#2(LEFT SIDE)APPROX. 40 FT IN TOTAL ERECT APPROX. 58 LINEAR FT OF CONSTRUCTION FENCE TO ENCLOSE THE POTENTIAL COLLAPSE ZONE & TO SAFEGUARD PUBLIC AND PROPERTY |
| Jan 21, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN-5-ALARM FIRE DAMAGED 6 BLDGS AT 819-829 RENSSELAER AVE. - CONT. FIRE DIVISIONS NOT INSTALL DURING CONSTRUCTION PARTYWALLS NOT ADEQUATE FIRE RATED.REQ INVEST&REPAIRS.CONTROL# 337149.SUBMIT FIRE PROTECT EVALUATION REPORT BY RA/PE BY 07/15/20.REPAIR WORK FOR CODE COMPLIANCE TO BEGIN UNDER PERMIT BY 09/15/2020 |
| Jan 21, 2020 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jan 21, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE:BUILDING SUFFERED A 5-ALARM FIRE ON 1/20/20.SEVERE FIRE DMG TO EXP1&2&3 WALLS/MANSARDS AT 3RD FLOOR LEVEL APPROXIMATE 75% ROOF FIRE DMG CANTILEVERED ENDS OF 3FL JOISTS MODERATE TO SEVERELY FIRE DMG@EXP1,2&3.NYS PE ENGR IMMED EVALU ENTIRE BLDG&DSGN REPRS.REPRS UNDR PRMT.FILE BY 3/9/20.STRT BY 3/30/20.SIGNOFF BY 6/8/20 |