Staten Island Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.NOTED: AT THE TIME OF OUR INPSECTION WE NOTED STRUCTURAL CHANGES TO A RETAINING WALL AT THE SIDE YARD OF THE PROPERTY THAT COULD HAVE COMPROMISED THE STRUCTUR AL STABILITY OF THE RW.THE OWNER HAS FAILED TO COMPLY W/PREVIOUS COMMI SSIONER'S ORDER REQUIRING A STRUCTURAL ASSESSMENT OF THE RETAINING WAL |
| Jan 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED STRUCTURAL HORIZONTAL ENLARGEMENT AT EXPO-1 EXTERIOR. NEW STRUCTURE(APPROX 20FTX45FT) INSTALLED WITH NO PERMITS, STRUCTURAL STABILITY UNKNOWN. STRUCTURE ROOF IN USE AS PATIO BY OCCUPANTS. PARTIAL VACATE ORDER ISSUED-STOP ALL USE OF UNPERMITTED STRUCTURE AND ALL USE OF STRUCTURE ROOFTOP |
| Jan 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED ALTERATIONS OF RETAINING WALL AND EARTH AT EXPO-2 PROPERTY PERIMETER PERFORMED. EXISTING RETAINING WALL APPROX 10FT HEIGHT RUNNING FULL LENGTH OF EXPO-2 MOVED BACK APPROXIMATELY 8 FT FROM ORIGINAL LOCATION. NO PERMITS FILED AS PER CODE REQUIREMENTS (28-105.1). STRUCTURAL STABILITY UNKNOWN |
| Jan 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED HORIZONTAL ENLARGEMENT OF EXPO-1 EXTERIOR INSTALLED. STRUCTURE APPROX 20FTX45FT(12FT HEIGHT) IN PLACE. NO PERMITS FILED AS PER CODE REQUIREMENTS (28-105.1). STRUCTURAL STABILITY UNKNOWN-ENGINEERS REPORT REQUIRED |