Staten Island New Springville-Willowbrook-Bulls Head-Travis
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 24, 2022 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Aug 22, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANCE, AT TIME OF INSPECTION DAMAGE OBSERVED AT 3RD FLOOR ROOF OPEN FOR ELEMENTS, CHARRED WOODEN JOIST,WALL AND CEILING DAMAGED EXCESSIVE WATER DAMAGE, AT 1ST AND 2ND FLOOR EXCESSIVE WATER DAMAGE WALL AND CEILING DAMAGED. DUE FIRE AND FIREFIGHTING OPERATION. VACATE ENTIRE PREMISES. |
| Aug 22, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED WOODEN JOIST CHARRED AT 3RD FLOOR. AT 1ST FLOOR LEFT SIDE PARTY WALL BULGING AT THE BOTTOM PART AND WALL UNEVEN. CRACKS ON 2ND AND 3RD FLOOR WALLS. |