Staten Island Tompkinsville-Stapleton-Clifton-Fox Hills
70 Beach Street, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
23 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 30, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN CODE COMPLIANT MANNER. AT SOUTH ELEVATION, EXP3 OBSERVED SPALLED BRIACKS AND CRACKED/DAMAGED MORTAR JOINTS AT MULTIPLE LOCATIONS.(THE OWNER HAD FOXED FACADE DEFECTS IN ALL ELEVATIONS EXCEPT SOUTH ELEVATIONS) REMEDY: REPAIR AND REPLACE |
| Aug 23, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG FACADES AND APPURTENANCES. AT EXPOSURE 1 & 4 OBSERVED CRACKS AND BROKEN CONCRETE LINTELS AND CRACKS IN MASONRY BRICKS WITH DETERIOATED MORTAR JOINTS IN MULTIPLE LOCATIONS. REMEDY: MAINTAIN BLDG FACADE, PROVIDE SAFETY MEASURES, REPAR DEFECTIVE FACADES AS PER 1 RCNY 103-04 |
| Jun 23, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 31, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL A SIDEWALK SHED ALONG ENTIRETY OF EXPOSURE 2 (DRIVEWAY AND PARKING LOT). INSTALL A SIDEWALK SHED ALONG ENTIRETY OF EXPOSURE 4 (DRIVEWAY) |
| Mar 30, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER. REMEDY: TAKE AND PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY AT EXP 1,2 AND 4 NORTHEAST AND WEST ELEVATIONS TAKE IMMED ACTIONS UNDER SUPERV OF A LIC PROF ENG'R TO REMOVE ALL UNSAFE CONDITIONS SUCH AS CRACKED LOOS CRACKED MASONRY. DISCONNECTED PIPING. ENGINNER TO PROVIDE DAILY FACADE CONDITIONS TO NYC DOB |
| Mar 30, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BLDG FACADE AND APPURTENACES. AT TIME OF INSPECTION OBSERVED A 7 STORY BLDG WITH DEFECT AT THE EXTERIOR WALL THROUGHOUT ALL EXPOSURES CONSISTING OF CRACKS BULGING BRICKS AND STONE. DEFECT WINDOWS WITH DAMAGE LINTELS AND SILLS SPALLING BRICKS AT EXP 2 MISSING STONE AT PARAPET. REMEDY: MAINTAIN EXTERIOR BLDG FACADE |
| Nov 22, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDGING EXTERIOR WALLS AND APPURTENANCES.HAZARDOUS CONDITONS WERE OBSERVED ON EXP 1 EAST ELEV 2 SOUT ELEV. 4 NORTH ELEV. CONDITIONS SUCH AS OPEN CRACKS OVER 1/2" WIDE, LOOSE VENT PIPE ON EXP 2 OPEN HOLES ON EXP 2 AND 4 ALSO ON EXP 1. REMEDY:MAINTAIN BLDG WALLS AND APPURTENANCES PROVIDE SAFETY MEASURES ON ALL EXPOSURES |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Mar 1, 2013 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 28, 2011 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 11, 2011 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Dec 31, 2009 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 1, 2009 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 1, 1990 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 24, 1990 | V*-DOB VIOLATION - DISMISSED | PA-PUBLIC ASSEMBLY NONE | PA-PUBLIC ASSEMBLY NONE |