NYC Building Report

Staten Island Mariner's Harbor-Arlington-Graniteville

70 Adrianne Lane, Staten Island

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 5-01702-0013), so they can include other buildings on the same lot.

11 records

Date Class Status Apartment Summary
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED Not available SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK PLANTER AT FRONT YARD YARD
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED Not available SECTION 27-2027 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING BRICK AT ENTRANCE WALK
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED Not available SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE 4 CU,YARDS TABLE, DOORS AT REAR YARD
Mar 6, 2008 B NOV SENT OUT 1 SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WASHER MACHINE HOOK UP ON EAST WALL CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 1, 2nd STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT DENIED 1 SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER SECOND FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 1, 2nd STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 1, 2nd STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT TUB IN THE BATHROOM LOCATED AT APT 1, 2nd STORY
Mar 6, 2008 B CERTIFICATION POSTPONMENT GRANTED 1 SECTION 27-2005 ADMIN. CODE: PROVIDE RAIL AT NORTH SIDE STAIRS IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY