Staten Island St. George-New Brighton
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 1, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG.AT BSMT OF PREMISES THERE IS A SINGLE LINE OF NON ENGINEERED SHORING IN PLACE.SHORING DOESNT HAVE POSITIVE CONNECTION TO JOISTS OR GROUND&LACK OF ANY CROSS BRACING.REMEDY:OWNER ENGAGE NYSPE ENG'R EVAL BLDG.OBTAIN PERM FOR REPAIR/SHORING NO LATER 8/21/17.SIGNED OFF REPAIR/SHORING JOBS NO LATER 9/11/17 |
| Jul 31, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 6, 1999 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Apr 20, 1994 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |