NYC Building Report

Staten Island Port Richmond

423 Heberton Avenue, Staten Island

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Apr 7, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE W/ROOF&WNDWS OPEN,HEAVILY CHARRED ROOF RAFTERS& JOISTS(ATTIC&2NDFL)LOCALLY,FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030425CFEU50103AK (CONTROL # 341956) IMMEDIATELY
Mar 4, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR DUE TO FIRE W/ROOF&WNDWS OPEN,HEAVILY CHARRED ROOF RAFTERS& JOISTS (ATTIC&2NDFL)LOCALLY,FIRE,WATER,&SMOKE DAMAGE THROUGHOUT.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT FILE FOR PRMTS BY 4/4/25.SGN OFF RPAIR PRMT
Mar 4, 2025 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Mar 3, 2025 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL UP ENTIRE BUILDING TO SAFEGUARD PUBLIC AND PROPERTY
Mar 2, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. . FIRE HAS CAUSED EXTENSIVE FIRE, WATER, AND SMOKE DAMAGE THROUGHOUT PREMISES AND LEAVING ROOF OPEN TO THE ELEMENTS. VACATE ENTIRE BUILDING.
Mar 2, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDING.NYC.GOV WITH IN 3 DAYS, ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED.
Nov 10, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION