NYC Building Report

Staten Island Rosebank-Shore Acres-Park Hill

31 Rockwell Avenue, Staten Island

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 5-02996-0008), so they can include other buildings on the same lot.

11 records

Date Class Status Apartment Summary
Nov 7, 2019 I VIOLATION DISMISSED Not available §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Jan 9, 2019 B VIOLATION CLOSED Not available § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT BASEMENT
Jan 9, 2019 B VIOLATION CLOSED Not available § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT BASEMENT
Jan 9, 2019 B VIOLATION CLOSED 1 § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING (APPROX 5 SQ FT) IN THE BOILER ROOM LOCATED AT APT 1, 1st STORY
Jan 9, 2019 B VIOLATION CLOSED 1 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BOILER ROOM LOCATED AT APT 1, 1st STORY
Jan 9, 2019 A VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SHEETROCK AT CEILING IN THE BOILER ROOM LOCATED AT APT 1, 1st STORY
Jan 9, 2019 A VIOLATION CLOSED 1 § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1, 1st STORY
Jan 9, 2019 B VIOLATION CLOSED 1 § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 1, 1st STORY
Jan 9, 2019 A VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY
Jan 9, 2019 A VIOLATION CLOSED 1 § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY
Jan 9, 2019 B VIOLATION CLOSED 1 § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING (APPROX 4 SQ FT) IN THE KITCHEN LOCATED AT APT 1, 1st STORY