Staten Island Rosebank-Shore Acres-Park Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 10, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: MASONRY SEAL ALL ACCESIBLE OPENINGS AND ACCESS POINTS TO PREVENT UNAUTHORIZED ENTRY AND TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Oct 28, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.THE 2NDFL JOISTS@APPRX FRNT 15FT OF THE BLDG WERE FIRE DMGD.EXP2WALL@1STFL NEAR 2/3CRNR PRTLLY OPEN APPRX 4FTX3FT W/WOOD LOAD BEARNG STDS EXPOSED.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 12/16/24 |
| Oct 28, 2024 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Oct 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE, FIRE DAMAGE IS THROUGHOUT WITH CHARRED WOOD FRAMING. |
| Oct 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING I N A CODE COMPLIANT MANNER.AT TIME OF INSPECTION, OBSERVED FIRE DAMAGE THROUGHOUT WITH CHARRED WOOD FRAMING THROUGHOUT. |
| Feb 25, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 25, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 26, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |