NYC Building Report

Staten Island New Dorp-Midland Beach

23 Winham Avenue, Staten Island

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Apr 17, 2026 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ALL ACCESSIBLE OPENING AS PER RCNY 3-01(A)(3) BY INSTALLING STUC- CO ON A PLYWOOD SEAL CONSTRUCTED OF BRICK WITH 5/8 INCH CDX GRADE PLYWOOD NAILED INTO FRAME OPENINGS WITH 8D COMMON NAILS EVERY 12 INCH- ES, GAIVANIZED WIRE LATH TO BE NAILED TO PLYWOOD USING 1 INCH ROOF NAILS EVERY 12 INCHES AND WIRE LATH WILL BE COVERED BY A 1 INCH COAT
Apr 2, 2026 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Jun 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2 WOODSTUDS@1STFL & SOME ATTIC JOISTS ALONG EXP2 WERE FIRE DMGD.EXP2 PARTIALLY OPEN&EXPOSD TO THE ELEMENTS NEAR ROOF LINE.TEMP ROOFNG INSTALLD@ROOF.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS.BLDG TO BE PERM RPAIRD UNDER PRMT STRTNG BY 7/14/24&CMPLTD&FILE RPAIR DWGS
Oct 3, 2024 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Mar 1, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMOVE ALL DEBRIS AND PARTIALLY COLLAPSED FENCE. SEAL ALL ACCESSIBLE OPENINGS
Mar 1, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL P.VACATE 10/2018 FOR CELLAR OCCUPANCY EXISTS ON THIS 1.5 1 FAMILY DWELLING. ATI DUE TO FIRE DAMAGE AT EXP 1,2 & 4 CHARRED MASONRY BRICKS, SIDING ALSO WALL STUDS EXPOSED & MISSING WINDOW AT ALL EXPOSURES, THIS ABANDONED BUILDING IS OPEN & UNGUARDED, A FULL VACATE IS REQUIRED.
Feb 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FIRE DAMAGED DWELLING HAS SEVERE DAMAGE TO EXTERIOR WALL AT EXPOSURE 2. ALSO ROOF DAMAGE AT EXPOSURE 1, 2, AND 4. ALL WINDOWS ARE MISSING WITH SOME BOARDED UP.
Jan 23, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 23, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 6, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL