NYC Building Report

Staten Island Mariner's Harbor-Arlington-Graniteville

23 Lake Avenue, Staten Island

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 5-01159-0043), so they can include other buildings on the same lot.

16 records

Date Class Status Apartment Summary
Dec 14, 2018 B NOV SENT OUT 2 § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY
Dec 14, 2018 B NOV SENT OUT 2 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY
Dec 14, 2018 B NOV SENT OUT 2 § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
Dec 14, 2018 B NOV SENT OUT 2 § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... PRESENT AT CEILING ( APPROX- 6 SQ,FT ) AND SOUTH WALL ( APPROX- 6 SQ.FT ) INSIDE-CLOSET IN THE 2nd ROOM FROM EAST LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOORING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 C VIOLATION CLOSED 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 C VIOLATION CLOSED 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 C VIOLATION CLOSED 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING INSIDE-CLOSET IN THE 2nd ROOM FROM EAST LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND WALLS INSIDE- CLOSET IN THE 2nd ROOM FROM EAST LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE NORTH WALL IN THE BATHROOM LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE OVEN AT GAS-RANGE IN THE KITCHEN LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE PILOT LIGHTS AT BURNERS AT GAS-RANGE IN THE KITCHEN LOCATED AT APT 2FLR, 2nd STORY
Nov 24, 2015 B NOV SENT OUT 2FLR SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 2FLR, 2nd STORY