Staten Island Tottenville-Charleston
217 Main Street, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
43 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 19, 2021 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | PARTIALLY DEMOLISH THE FRONT EXTENSION(APPROX 65 FT W X 35 TO 54 FT D) 2 STORY + PARTIAL CELLAR. REAR PORTION OF THE 1 STORY BUILDING WITH GABLE ROOF(APPROX 65 FT W X 135 FT D) TO REMAIN. AFTER FRONT EXTENSION IS DEMOLISHED, PROVIDE TEMPORARY WEATHER WALL AT EXP# 1 OF REMAINING BLDG APPROX 65 FT WIDE X 40 FT TALL TO PROTECT FROM THE ELEMENTS |
| Oct 28, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 28, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 28, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 7, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTC W/ COMMISH ORDR#322430(041620FEU50301PN)DATED 04/16/2020 REQUIRING OWNR CNTRCTR CONT PERMTD WRK FOR STRCT REPR @FRONT EXT ALONG MAIN.ST AS OF 07/07/2020,NO REPR/STABILIZE WRK HAS BEEN PRFORMD ON FRONT EXT IMMED COMPLY W/COMMISH ORDR#322430 DATE 04/16/2020 TO REPR/STABILIZE FRONT EXT EXP 1,2,4 WALLS |
| Jul 7, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PE SUBM SIGN&SEAL ENG'R REPT INDICATING EXP1,2,&4 WALLS NEAR THE FRONT BLDG ARE NOT IN DANGER OF COLLAP&NO ADDT'L SIDE WALL SHORING REQ.AS OF 6/17/20 DOB OBS.PART COLLAP ROOF@EXP1/2 CRNR &CRCKS EXP1,1/2 CRNR& 1/4 CRNR.BY CLOSE OF BUSN 7/13/20 PROV DOB SIGN & SEAL CALCS FOR EXISTING EXP1,2&4 WALLS.INCLUDE FIELD SIZES,STRESS DEFLECT CODE COMPLIANCE ETC |
| Jul 7, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER # 322401 REQ CALCULATIONS AND REPORTS TO BE SENT TO THE NYC DOB BY MARCH 13,2020 RELATED TO JOB #520358078,PERMITTED DRAWINGS PREPARED BY PE(#059599).NO CALCULATIONS RECEIVED BY NYC DOB AS OF JULY 7, 2020.IMMEDIATELY COMPLY WITH COMMISH ORDER # 322401 (030320FEU503TDL01) |
| Apr 16, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK ORDER FOR ESSENT'L CONST:EXEC ORDER #202.13 ALLOWS CERTAIN CONST TO CONTIN AS ESSENT'L NYS EXEC ORDER #202.6.CONTINUE WORK UNDER PRMT#520358078-01-AL PERTAIN TO REPR WRK@FRNT EXTN ALONG EXP1,AT MAIN ST ONLY.CONTIN ESSENT'L STRCTL REPR WRK@FRNT EXTN ALONG MAIN ST UNDER PERMIT ONLY.MAKE SITE SAFE BEFORE STOPPING WRK.AVOID TRANSM COVID-19 |
| Mar 3, 2020 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | THE +/40'TWO STORY STRUCTURE BORDERING MAIN STREET IS TO BE DEMOLISHED IMMEDIATELY ,WITH THE TWO LONG THEATER WALLS CUT BACK TO A SAFE LEVEL AND SEAL THE OPENING INTO THE EMPTY THEATER SPACE,INSTALL A NEW 8'HIGH TIGHT BOARD FENCE ALONG MAIN STREET AND THE TWO SIDE ALLEYS |
| Mar 3, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION:LEANING FENCE&CRACKS THRU BRICK WORK AT FRONT WALLS.DRAWINGS ARE NOT PERMITTED.ALTERATION REQUIRES PARTIAL DEMO AND RESTRUCTURING OF THE BLDG.BY CLOSE OF BUSINESS 3/13/20 PROVIDE DEPT WITH ENGINEERING CALCS FOR EXISTING TRUSSES/(THEY ARE EXPOSED).CALCS FOR STABILITY OF SIDE WALLS BEFORE&AFTER FRNT EXT REMOVAL FOUNDATIONS |
| Jan 31, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #322400 (122619FEU50301PN) REQUIRING OWNR TO RETAIN NYSPE&LIC CONTRCT TO IMMED DEMO FRONT 2 STORY EXT'N WITH PARTIALLY COLLAPSED WOOD FRAME ROOF&2ND FLS&UNBRACED EXP 1, 2,4 MASONRY WALLS.WRK REQ'D TO STRT BY 1/6/20 & CMPL BY 1/24/20.IMMED COMPLY WITH COMMISH ORDER #322400(122619FEU50301PN)DATED 12/26/19 |
| Dec 26, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK ORDER:FRONT EXTN IN STATE OF SEVERE DISREP.APPX 50% OF 2ND STRY FLAT ROOF&FL COLLAP@EXP 1/2 CORNR.EXP 1,2&4 MASONRY WALLS INADEQ BRACED@FRNT EXT.EXP1&2 WERE CRACKE@ROOF LEVEL TO PARAPHET.OWNR RETNPE &LIC CONTR IMMD DEMO FRNT 2 ST EXTN.SHORE STABLZE REAR BLDG.WORK UNDER CONT SUPV&DIR PE.FILE PRMT W/IN 2 DAYS.WRKSTRT BY 1/6/20&CMPL 1/24/20 |
| Nov 6, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #315943 (070819FEU50301PN) REQUIRING OWNER TO ENGAGE NYSPE TO EVALUATE ENTIRE BUILDING AND REPAIR UNDER PERMIT STARTING BY 8/12/2019.NO PERMIT FOR BUILDING REPAIRS HAS BEEN OBTAINED AS OF 11/06/2019.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #315943 (070819FEU50301PN)DATED 07/08/2019 |
| Jul 8, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:FRNT EXT.ROOF&2FLR HAD PART COLLAP@EXP2 SIDE APPROX 35'WX30'D.FRNT EXP4 SIDE HAD PART COLLAP 1ST,2ND&ROOF APPROX 30'WX20'D.EXP2 WALL WAS CRACKED&BULGING APPROX 15 LF. MASN PERIMETER WALLS HAD VARIOUS CRACKS THROUGHOUT.FRNT EXTN@FURTHER RISK OF COLLAP.OWNR ENGAGE NYSPE TO EVAL ENTIRE BLDG&PREPARE REPR PLNS.REPR BLDG UND PRMT STARTING BY 8/12/19 |
| Mar 22, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 22, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 7, 2016 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | SUPERCEDES.#8948 |
| Apr 20, 2015 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Aug 13, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 3, 2014 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| May 30, 2014 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| May 24, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 28, 2011 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Mar 20, 2007 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Feb 2, 2006 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 15, 2005 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 28, 2004 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 30, 2003 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 16, 2002 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 11, 2001 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Jan 13, 2000 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Feb 19, 1999 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Apr 28, 1998 | V*-DOB VIOLATION - DISMISSED | CMQ-MARQUEE OTHER REQUIRED | CMQ-MARQUEE OTHER REQUIRED |
| Feb 5, 1997 | VH*-VIOLATION HAZARDOUS DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 26, 1996 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 17, 1993 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 26, 1993 | V%*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Apr 26, 1993 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Mar 12, 1993 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 3, 1993 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 19, 1993 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 14, 1992 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |