Staten Island West New Brighton-Silver Lake-Grymes Hill
20 Stanley Avenue, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 13, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 16, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN IN SAFE COND.2ND FL BALCONY IN SEVRE STATEOF DISRPAIR W/FLOOR DECKING DETERIORATD & PARTIALLY DETACHED.BALCONYSLOPING TOWARD EXP4 UNSAFE.EXP1 WOOD SILL DETERIORATED & PART DETACHD.OWNR RETAIN NYS NYSPE-EVAL ENTIRE BLDG-PREP/FILE RPR DWGS W/DOB BLDG REPRS UNDR PRMT START BY 03/14/22,COMPLT/SIGNOFF 4/8/22 |
| Feb 16, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 10, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 17, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED APPROX. 8'-0" X 5'-0" SIZE WOODEN BALCONY PLATE FORM INSTATE OF DISREPAIR WITH SLIGHTLY LEANING & UNSTABLE ON 2ND FLOOR LEVEL AT EXPO # 01. ALSO OBSERVED APPROX. 5'-0" HIGH CINDER BLOCK RETAINING WALL LEANING OUTWARD WITH CRACKS AND SEPARATION ON FRONT YARD. ROOF FASCIA DISREPAIR WITH MISSING SECTION. |