176 Benziger Avenue, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 27, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | TEMPORAILY BRACE LOOSE MASONRY AT 1 STORY, 2 CAR-CAR GARAGE @EXP#1 PIERS SUPPORTING STEEL LINTEL , BRICK PIERS ABOVE GARAGE ROOF, & EXP# 2 & 4 WALLS TO PROTECT PUBLIC & ADJACENT PROPERTIES FROM POTENTIAL FALLING DEBRIS.RECOMMEND GALVANIZED STEEL STRAPS WITH NETTING , OR SIMILAR . USE THE SERVICE OF A LIC NYS PE TO INSTALL METAL STRAPS |
| Dec 27, 2019 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Dec 26, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EXP1 GAR MASONRY PIERS WERE CRACK,LOOSE&BULGING OUT.ROOF SLAB CRACKED ALONG EXP 1,2,4.STEEL LINTEL ABVE GARAGE DOORS HEAVILY CORRODED.EXP2&4 GARGAGE MASONRY WALLS VARIOUS CRACKS&SPALLING.EXP3/4 CRNR OF BLDG PART COLLAP&OPEN.SIDING&WOOD FRAME INADEQ ATTACHED.OWNR ENGAGE NYSPE EVAL ENTIRE BLDG&PREPARE REPR DWGS.REPRS STRT 1/27/20 UNDR PRMT&CMPL 3/6/20 |
| Jul 10, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 10, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER NOTED: FRONT GARAGE HAS MISSING PART OF GATE AND AT DISREPAIR CONDITION WITH VERTICAL AND HORIZONTAL MASONARY CRACKS ALSO OBSERVED AT ROOF, FRONT FASCIA IS MISSING REMEDY: REPAIR OR REPLACE |