Staten Island Port Richmond
139 Woodruff Lane, Staten Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 25, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE NYS PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS,CALCULATIONS,PROBES,ETC & SUBMIT REPORT ACCEPTABLE TO THE DEPT. REPAIR DRAWINGS TO BE FILED WITH THE DOB WITHIN 45 DAYS AFTER THE INSPECTION |
| Sep 20, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED |
| Jun 2, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 139 WOODRUFF LANE IS AN OCCUPIED ONE STORY WAREHOUSE W/ A WOOD BOWSTRING TRUSS ROOF. W/IN 60 DAYS OF VIOL, OWNER TO ENGAGE A NYS(LIC) PE EXP W/ WOOD TRUSSES TO PROBE & EVAL STRUCTURE. EACH TRUSS & BEARING TO BE EVAL. ANY DEFICIENCIES TO BE SHARED. FILE REPAIR DRWGS W/ DOB W/IN 45 DAYS AFTER THE INSPECTION |