NYC Building Report

Staten Island St. George-New Brighton

12 Clinton Avenue, Staten Island

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Aug 12, 2025 V%-DOB VIOLATION UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Jul 14, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.BLDG SAFE CONDN:BLDG SUFERED PREV FIRE DMGE.EXP1&4 WALLS PRTLY OPN &EXP'D TO ELMTS,W/SURROUNDNG SIDE PRTLY DETCH&LOOSE.UNDRSIDE OF 2FL JOIST & INTER 1FL WALLS HAD FIRE DMG.INTER FILLED WITH DEBRIS IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 357109 (080521FEU501PN) TO REPAIR BLDG UNDER PERMIT
Aug 20, 2021 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Aug 9, 2021 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT TIGHT BOARD FENCE ALONG EXPOSURE#1 APPROXIMATELY 43.LINEAR FEET TO SECURE THE PROPERTY FROM UNAUTHORIZED ACCESS
Aug 5, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG SAFE CONDN:BLDG SUFERD PREVIOUS FIRE DMGE.EXP 1&4 WALLS PRTLY OPEN&EXP'D TO ELMNTS,W/SURROUNDNG SIDING PRTLY DETCH&LOOSE.UNDRSIDE OF 2ND FL JOIST&INTER 1ST FL WALLS HAD FIRE DMG.INTER FILLED WITH DEBRIS OWNER TO RETAN NYS PE TO EVALU ENTIRE BLDG&PREP/FILE REPR DWGS.BLDG TO BE RPRD UNDR PERMT STRT BY 09/06/2021+CMPLTD/SIGNED OFF BY 10/15/2021
Dec 16, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE BUILDING STRUCTURE DUE TO FIRE AT 12 CLINTON AVE STATEN ISLAND. A FULL VACATE ORDER ISSUED ON ENTIRE BUILDING AND BOARDED UP ALL ACCESSIBLE OPENINGS.
Mar 3, 1999 V%*-DOB VIOLATION - DISMISSED UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE