Staten Island Mariner's Harbor-Arlington-Graniteville
117 Holland Avenue, Staten Island
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 5-01272-0011), so they can include other buildings on the same lot.
7519 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 14, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK AT DOOR EXTERIOR AT 1st PUBLIC HALL BULKHEAD FROM NORTH AT WEST |
| Apr 14, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK AT DOOR EXTERIOR AT 1st PUBLIC HALL BULKHEAD FROM EAST |
| Apr 7, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR KNOB, AND ASSEMBLY ON THE COMPACTOR ROOM DOOR AT PUBLIC HALL, 6th STORY |
| Mar 30, 2023 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BOILER ROOM, 1st STORY |
| Mar 30, 2023 | C | VIOLATION CLOSED | 2H | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 30, 2023 | C | VIOLATION CLOSED | 2H | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 24, 2023 | C | VIOLATION CLOSED | 9B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9B, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Mar 8, 2023 | C | VIOLATION CLOSED | 13A | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .AT SINK, WASHBASIN AND BATHTUB IN THE ENTIRE APARTMENT LOCATED AT APT 13A, 13th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 8, 2023 | C | VIOLATION CLOSED | 13A | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES .AT SINK, WASHBASIN, BATHTUB AND WATER-CLOSET IN THE ENTIRE APARTMENT LOCATED AT APT 13A, 13th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 8, 2023 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED TO BOILER ROOM AT PUBLIC HALL, 1st STORY |
| Mar 8, 2023 | C | VIOLATION CLOSED | 13A | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 13A, 13th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 2, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAILBOXES COMPACTMENT AT NORTH WALL AT PUBLIC HALL, 1st STORY |
| Mar 1, 2023 | B | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT LAUNDRY ROOM, 1st STORY |
| Mar 1, 2023 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT LAUNDRY ROOM, 1st STORY |
| Mar 1, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING & WEST WALL AT LAUNDRY ROOM, 1st STORY |
| Feb 23, 2023 | C | VIOLATION CLOSED | 8B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 8B, 8th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Feb 23, 2023 | C | VIOLATION CLOSED | 8B | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Feb 2, 2023 | C | VIOLATION CLOSED | 4E | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 24, 2023 | C | VIOLATION DISMISSED | 11A | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WATER CLOSET, BATHTUB, WASHBASIN AND SINK IN THE ENTIRE APARTMENT LOCATED AT APT 11A, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 24, 2023 | C | VIOLATION DISMISSED | 11A | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK, WASHBASIN AND BATHTUB IN THE ENTIRE APARTMENT LOCATED AT APT 11A, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 24, 2023 | C | VIOLATION WILL BE REINSPECTED | 5E | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK, WASHBASIN, AND BATHTUB IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 24, 2023 | C | VIOLATION WILL BE REINSPECTED | 5E | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SINK, BATHTUB, WATER CLOSET AND WASHBASIN IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 24, 2023 | B | VIOLATION WILL BE REINSPECTED | 5E | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CLOSET DOOR AT WEST WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 20, 2023 | B | VIOLATION WILL BE REINSPECTED | 5E | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WEST CLOSET DOOR IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 20, 2023 | B | VIOLATION WILL BE REINSPECTED | 5E | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 20, 2023 | B | VIOLATION WILL BE REINSPECTED | 5E | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | A | VIOLATION CLOSED | 8A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 18, 2023 | B | VIOLATION DISMISSED | 8A | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 18, 2023 | B | VIOLATION DISMISSED | 8A | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 18, 2023 | B | VIOLATION DISMISSED | Not available | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF RANGE IN PUBLIC HALL , 4th STORY |
| Jan 18, 2023 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING , 8th STORY |
| Jan 18, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT AT CEILING IN STAIR WELL A , 8th STORY |
| Jan 18, 2023 | B | VIOLATION CLOSED | 4L | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AROUND REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | B | VIOLATION CLOSED | 4L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | A | VIOLATION CLOSED | 4L | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | B | VIOLATION CLOSED | 4L | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | B | VIOLATION CLOSED | 4L | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN THE WASTELINE UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 5th APARTMENT FROM WEST AT NORTH |
| Jan 18, 2023 | B | VIOLATION CLOSED | 8A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 18, 2023 | B | VIOLATION CLOSED | 8A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 5, 2023 | B | VIOLATION CLOSED | 12H | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, WEST AND EAST WALLS APPROX 10 SQ FT IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Dec 27, 2022 | B | VIOLATION CLOSED | 12E | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL NEAR OUTLETS IN THE 1st ROOM FROM EAST LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 27, 2022 | A | VIOLATION CLOSED | 12E | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 12E, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 19, 2022 | C | VIOLATION CLOSED | 4E | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 19, 2022 | C | VIOLATION CLOSED | 4E | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 16, 2022 | A | VIOLATION CLOSED | 8D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 8D, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH |
| Dec 16, 2022 | A | VIOLATION CLOSED | 8D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH |
| Dec 16, 2022 | C | VIOLATION CLOSED | 8D | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 8D, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH |
| Dec 16, 2022 | C | VIOLATION CLOSED | 8D | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH |
| Nov 30, 2022 | C | VIOLATION CLOSED | 2M | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE REPAIR/HINGES IN THE ENTRANCE LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 30, 2022 | B | VIOLATION CLOSED | 2M | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |