NYC Building Report

Staten Island St. George-New Brighton

111 Victory Boulevard, Staten Island

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Mar 15, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER HAS BULGE AND A CAR HAS IMPACTED EXP.# 1 WALL . REMEDY : SUBMIT AN ENGINNERS REPORT EVALUATING THE CITED CONDITIONS WITH PHOTOS AND TIME FRAMES FOR REPAIR S TO ERTINSPECTIONS @BUILDINGS.NYC.GOV WITHIN 7 DAYS 718-286-3760
Mar 15, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO MOTOR VEHICLE IMPACTING BUILDING DAMAGING METAL STORE FRONT AND GLASS ALONG WITH BRICK VENEER AND ROLL DOWN GATE AT FIRST FLOOR LEVEL OF BUILDING.
May 24, 2013 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
May 24, 2013 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 29, 1995 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 8, 1992 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL