NYC Building Report

Queens Springfield Gardens (North)-Rochdale Village

BIN 4612667

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

1448 records

Date Status Type Summary
Jun 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #031924CFA41 203AB REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY REG DESIGN PRO AND SUBMIT A REPORT TO FACADE VIA EMAIL BY 4/15/26 AS OF 6/29/2026, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADE UNIT. REMEDY: COMPLY WITH DOB VIOLATION #031924CFA41203AB IMMEDIATELY
Dec 15, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 SOUTH ELEV,SPALLED ROOF EAVE AT MULTIPLE LOCATIONS,CRACKED BALCONY GLASS RAILS ON 10TH FL.EXP2,SPALLIN G BALCONY SLAB ON 10TH FL.EXP3 & 4 SPALLING ROOF EAVE AT MULTIPLE LOCA TIONS.EXP4 SPALLING BALCONY SLAB.REMEDY:REPAIR AND/OR REPLACE DAMAGE
Dec 15, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV,SPALLING CONCRETE EA VE AT SEVERAL LOCATION,CRACKED BALCONY GLASS RAIL PANELS.EXP2 SOUTH EL EV SPALLING BALCONY SLAB,SPALLING EAVE.REMEDY:REPAIR AND/OR REPLACE DA MAGED EAVE AND CRACKED GLASS PANELS
Mar 5, 2025 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 5, 2025 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 11, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER. VACATE FACADE BALCONIES DUE TO CRACKED GLASS RAILING @ TOWER B APT #7F & TOWER C APT #7D & 10D ALSO VACATE SET-BACK FIRST LVL BTW TOWER B & TOWER C AT WEST ELEV DUE TO LOOSE/CRACKED CON- RETE ABOVE. REMEDY: VACATE BALCONIES AT APT #7F AND 7D AND 10D ALSO SETBACK FIRST LVL ROOF @ WEST ELEV
Dec 11, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 26, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 13, 2024 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 13, 2024 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 1, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO MISSING GLASS RAILINGS AT TOWER A - APT 4G, TOWER B - APT. 4G AND TOWER C - APT #10E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 4G, TOWER B - APT. 4G AND TOWER C - APT 10E
Oct 1, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER B APARTMENTS #S 12A, 7E AND 11E. REMEDY: FULLY VACATE BALCONIES FOR TOWER B APARTMENTS #12A, 7E AND 11E
Oct 1, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER A - APT10A; TOWER B - APT12A AND TOWER C - APT 12E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 10A, TOWER B - APT. 12A AND TOWER C - APT 12E
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED. AT EXP#2 AND 4 MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATION. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED:AT EXP#2 & 4 BROKEN/MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE. AT EXP 2 & 4 ELEVATION 8,12,26 MISSING BALCONY RAILING GLASS. AT EXP 1 ELEVATION 27 5FL OBSERVED BROKEN GLASS WINDOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASUR TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS OR LOOSE MATERIALS AS PER IRCNY 103-04
Sep 12, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 30, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER. OBSERVED: CRACKED/SPALLING BALCONY SLABS AND BROKEN GLASS RAILINGS AT MULTIPLE LOCATIONS THROUGHOUT ENTIRE FACADE REMEDY: VACATE ALL FACADE BALCONIES
Aug 27, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXP2 (SOUTH ELEVATION TOWER B LINE E) SPALLING/CRACKED CONCRETE SLAB @ ROOF LEVEL. ALSO BROKEN GLASS RAILING AT BALCONY MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXP 2 & 4 SOUTH & NORTH ELEV TO SECURE/PROTECT THE PUBLIC & REMOVE ALL LOOSE MATERIALS
Jul 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION BY DATE 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY & REPAID THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027.)
Jul 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENATION FOR COMPLETED REPAIR SWARMP DONDITION DATE BY 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADE BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
Jul 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FIX AS SWARMP CONDITION & QEWI RECOMMENDATIONS FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
Jul 29, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027)
Jul 12, 2024 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9A UNSAFE REPORT FILED
Jun 26, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 15, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 14, 2024 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9A UNSAFE REPORT FILED
Mar 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO COLLAPSING MASONRY BRICKS AT SOUTH ELEVATI ON EXPOSURE#4 BETWEEN SIXTH AND SEVENTH FLOORS.REMEDY:THE OWNER IS TO IMMEDIATELY PROVIDE SIDEWALK SHED AND SECURED FENCES AROUND ALL IMPACT ED AREAS
Mar 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN FACADE.OBSERVED COLLAPSED MASONRY BRICKS AR SOUTH EXP#4 BETWEEN 6TH AND 7TH FLOOR.THE OWNER IS TO IMMEDIATELY RETAIN SER VICE OF REG DESIGN PRO WITH QEWI CERTIFICATION AND MASONRY BRICK FACAD E EXPERIENCE TO INSPECT & EVALUATE 100% HANDS ON.REMEDY:INSTALL PUBLIC PROTECTION.SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV BY 4/15/2024
Mar 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER 3/19/2024 OBSERVED COLLAPSED MASONRY BRICK AND MO RTAR AT SOUTH ELEVATION EXP#4 AT BETWEEN 6TH AND 7TH FLOOR OVER SOUTH YARD.THESE CONDITIONS HAVE THEREFORE MADE THE SOUTH YARD UNABLE TO BE OCCUPIED EXCEPT IN EMERGENCY SITUATIONS.REMEDY:IMMEDIATELY VACATE ENTI RE SOUTH YARD
Mar 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER 3/19/2024 OBSERVED CRACKED/SPALLED CONCRETE BALCO NY SLABS AT MULTIPLE LOCATIONS.THESE CONDITIONS HAVE THEREFORE MADE TH E ENTIRE BALCONIES UNABLE TO BE OCCUPIED.REMEDY:IMMEDIATELY VACATE ENT IRE BALCONIES
Mar 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT THE TIME OF INSPECTION OBSERVED.MISSING METAL PARAPET RAILING AT THE ROOF LEVEL.REMEDY:IMMEID ATELY REPAIR PARAPET RAILING
Mar 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT CORNER OF EXP. 3 AND 4 DISLODGED BRICKS (APPROX. 8'X 6')THAT HAVE FALLEN TO GRADE.
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION