Queens Woodside
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 2, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGNCY WRK: CRACKS & SEPARATION OBSERVED IN THE SIDEWALK ADJACENT TO A CONSTRUCION SITE, CONSISTING OF A CANTILEVERED SOE SYSTM ALONG EXP#1 ,3&4. THE CRACKS OBSERVED ARE INDICATIVE OF MOVEMENT. REMEDY: IMMED RETAIN NYS PE2PREPARE BRACNG/STABILZTN PLANS.WRK2 STRT BY 6/2,SUPVSD BY PE,CS,FILED W/I 2BUS.DAYS.STAB RPT@ENDOFOPS |
| May 22, 2025 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: BACKFILL TO GRADE APPROX 680 CUBIC YARDS OF MATERIAL REQUIRED |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Jul 29, 1996 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |