Queens Murray Hill-Broadway Flushing
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 24, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN PROP SAFELY/CODE-COMPLIANT. 2-STORY BLDG W BRICK WALLS, WOOD JOISTS, PARTIALLY DEMO'D. UNBRACED WALLS, SAGGING/MISS FLRS, POSS. UNDERMINED FDN DUE TO TRENCHING. REMEDY: COMPLY W CODE RETAIN NYS RDP TO STABILIZE/SECURE SITE. FILE DRWGS BY 4/30. START WRK BY 5/9/25. SUBMIT DOCS FOR CSE REVIEW |
| Apr 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMPLY W/ CODE. HIRE NYS PE FOR MONITORING/INSPECTIONS. TAKE READINGS BY 5/2/25. INSPECT BY 4/25/25. ALERT DOB OF CHGS. REMEDY: COMPLY W CODE. HIRE PE FOR MONITORING/INSPECTIONS. TAKE READINGS BY 5/2/25 INSPECT BY 4/25/25. ALERT DOB OF CHGS |
| Apr 23, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK: 2-STY BLDG W/ BRK MASONRY WALLS & WD JOISTS DEMO'D WALLS UNBRACED, CRACKING. NO PUBLIC PROTECTION IMMEDIATELY HAZARDOUS CONDITIONS. REMEDY: COMPLY W. CODE. HIRE PE.& GC TO INSTALL PUBLIC PROTECTION AT EXP#1. SUBMIT SKETCH ASAP AND COMPLETE WORK BY 4/28/25 |