NYC Building Report

Queens Whitestone-Beechhurst

BIN 4522669

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
May 18, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED DUE TO CAR IMPACTED BUILDING AT EXPO 2, 1ST FLOOR REAR OF STUCCO WALL DAMAGED INTERIOR WALL BOWED IN AT GAS PIPES AT FRYER INTERIOR KITCHEN.
May 18, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED DUE TO CAR IMPACTED BUILDING AT EXPO 2, 1ST FLOOR REAR OF STUCCO WALL DAMAGED INTERIOR WALL BOWED IN AT GAS PIPES AT FRYER INTERIOR KITCHEN, STRUCTURAL STABILITY IS IN QUESTION.
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jul 24, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 23, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 21, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 28, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 25, 1991 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL AL