Queens Elmhurst
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Nov 26, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. ALT 1 PERMIT #410044875 TWO STEEL BEAMS ARE SHOWN ON AMEN DED PLAN FOR SUPPORT OF STAIRS AT FLOORS 2 & 3. ONLY ONE IS PLACE ON F LOOR 2.FLOOR 3 IS COVERED WITH SHEETROCK.REMEDY: STOP ALL WORK.PROVIDE SHOP DRAWING BY ENGR. CALL SEP/EX ENGR REVIEW. 212 442-1698/1544 |
| Aug 5, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS. THERE IS NEW TEMOPORARY SHORING @ THE CELLAR ALSO NEW STEEL I BEAMS 1ST AND 2ND FLOOR THE STAIRWELL WALLS FRAMED WITH WOOD 2 X 4'S. A NEW CMC COLUMN SUPPORTING THE CORNER OF EXTERIOR FRONT OF BLDG. ALL CONTARY TO JOB # SUPPORTING THE CORNER OF EXTERIOR |
| May 23, 2008 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 1, 2008 | V*-DOB VIOLATION - DISMISSED | Z-ZONING NONE | Z-ZONING NONE |