Queens Whitestone-Beechhurst
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 27, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE ADJACENT PROPERTY (167-23) DID ILLEGAL EXCAVATION BY UNDERPINNING THE ENTIRE FOUNDATION WALL IN THE CELLAR. THIS CAUSED THE ENTIRE BUILDING TO BE STRUCTURALLY UNSTABLE MAKING IT UNSAFE FOR OCCUPANCY. |
| Dec 27, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE ADJACENT PROPERTY (167-23) DID ILLEGAL EXCAVATION BY UNDERPINNING THE ENTIRE FOUNDATION WALL IN THE CELLAR. THIS CAUSED THE ENTIRE BUILDING TO BE STRUCTURALLY UNSTABLE MAKING IT UNSAFE FOR OCCUPANCY. |
| Dec 27, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT CELLAR OBSERVED EXCAVATED APPROX. 11 INCHES. INSTALLED REBARS ALL AROUND. UNDERPINNING WAS DONE WITH FRESH CONCRETE. THE ENTIRE CELLAR FOUNDATION WALL HAS BEEN UNDERMINED CAUSING STRUCTURAL INSTABILITY THROUGHOUT THE BUILDING. THIS HAS MADE IT UNSAFE FOR ANY OCCUPANCY. |
| Dec 27, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT CELLAR OBSERVED EXCAVATED APPROX. 11 INCHES. INSTALLED REBARS ALL AROUND. UNDERPINNING WAS DONE WITH FRESH CONCRETE. THE ENTIRE CELLAR FOUNDATION WALL HAS BEEN UNDERMINED CAUSING STRUCTURAL INSTABILITY THROUGHOUT THE BUILDING. THIS HAS MADE IT UNSAFE FOR ANY OCCUPANCY. NO PERMIT FOR THIS WORK AT TIME OF INSPECTION. |