Queens Jamaica Estates-Holliswood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
113 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 WD FRAME APPEARS TO BE LOAD BEAR.EXP3 FACADE TO BE REMOVED UNDR EMERG WRK CTRL #322130(101519FEU40805PN)DUE TO COLLAP EXP3 FACADE @2FL-ROOF.REMAIN WALL LOOSE BULG W/INADEQ&CORROD BRICK TIES.EXP3 WALL& CEIL FINISHES HAD CRACKS.OWNR RETAIN PE TO EVAL ENTIRE BLDG.PE PREPARE REPR DWGS.REPR WRK TO STRT UNDR PRMT BY 11/11/19& BE CMPL BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 BRICK FACADE TO BE REMOVED UNDER EMERG WORK CTRL NO 322126 (101519FEU40801PN)DUE TO UNSTBL FACADE@RISK OF COLLAP.INADEQ BRICK TIE LIKELY CORRODED.EXP3 WD FRAME APPEARS TO BE LOAD BEAR.OWNR RETAIN PE TO EVAL ENTIRE BLDG,INCLUD ALL FACADES,WTR PROOF&BACK UP WALL FRAME.PE PREP REPR PLNS.REPR WRK TO ST,UND PRMT BY 11/11/19&BE CMPL BY12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF@87-26 TO 87-30 ON 10/14/19.SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WD FRAME IS LOAD BEAR.OWN RETAIN PE IMMED ERECT FENCE@EXP3 YARD.REMOVE UNSTBL EXP3 BRICK AS REQ.TEMP WTR PROOF EXP3 WRK UNDR DIRECT OF PE.FILE JOB W/IN 2 DAYS STRT WRK.DAILY REPTS TO FEU |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 WD FRAME APPEARS TO BE LOAD BEAR.EXP3 FACADE TO BE REMOVED UNDR EMERG WRK CTRL #322130(101519FEU40805PN)DUE TO COLLAP EXP3 FACADE @2FL-ROOF.REMAIN WALL LOOSE BULG W/INADEQ&CORROD BRICK TIES.EXP3 WALL& CEIL FINISHES HAD CRACKS.OWNR RETAIN PE TO EVAL ENTIRE BLDG.PEPREPARE REPR DWGS.REPR WRK TO STRT UNDR PRMT BY 11/11/19& BE CMPL BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF @87-26 TO 87-30 ON 10/14/19.SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WD FRAME IS LOAD BEAR.OWN RETAIN PE IMMED ERECT FENCE@EXP3 YARD.REMOVE UNSTBL EXP3 BRICK AS REQ.TEMP WATER PROOF EXP3 WRK UNDR DIRECT/PE.FILE JOB W/IN 2 DAYS STRT OF WRK.DAILY REPTS FEU |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP 3 WD FRAME WALL WAS A LOAD BEAR WALL.EXP3 FACADE TO BE REMOVED UNDER EMERG WRK CTRL #322129(101519FEU40804PN)DUE TO PART COLLAP EXP3 BRICK FACADE@2FL-ROOF.REMAIN BRICK UNSTBL,BULG&INADEQ CORRODED&BRICK TIES.INT EXP3 WALL&CEIL HAD CRACKS.OWNR RETAIN PE TO EVAL ENTIRE BLDG, PE PREP REPR DWGS.REPR WRK STRT UNDR PRMT BY 11/11/19&CMPL BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF @87-26 TO 87-30 ON 10/14/19.SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WD FRAME IS LOAD BEAR.OWN RETAIN PE IMMED ERECT FENCE@EXP3 YARD.REMOVE UNSTBLE EXP3 BRICK AS REQ.TEMP WTR PROOF WORK UNDR CONT&DIR PE.FILE JOB W/IN 2 DAYS FROM STRT OF WRK.DAILY REPTS FEU |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF @87-26 TO 87-30 ON 10/14/19.SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WD FRAME IS LOAD BEAR.OWN RETAIN PE IMMED ERECT FENCE@EXP3 YARD.REMOVE UNSTABLE EXP3 BRICK AS REQ.TEMP WTR PROOF EXP3 WRK UND CONT&DIR OF PE.FILE JOB W/IN 2 DAYS STRT OF WRK.DAILY REPTFEU |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 WD FRAME APPEARS TO BE LOAD BEAR.EXP3 FACADE TO BE REMOVED UNDR EMERG WRK CTRL #322131(101519FEU40806PN)DUE TO PART COLLAP EXP3 FACADE@87-26 TO 87-30.REMAIN WALL LOOSE,BULG&HAD INADEQ&CORROD BRICK TIES&WAS @RISK OF COLLAP.OWNR RETAIN PE TO EVAL ENTIRE BLDG.PEPREPARE REPR DWG.REPR WRK TO STRT UNDR PRMT BY 11/11/19 & BE CMPL BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 WD FRAMING APPEARS TO BE LOAD BEAR.EXP3 FACADE TO BE REMOVED UNDER EMERG WRK CTRL NO 322127 (101519FEU40802PN)DUE TO UNSTABLE AND BULGING FACADE@RISK OF COLLAPSE.INADEQ BRICK TIES,LIKELY CORRODED.OWNR TO RETAIN NYSPE TO EVAL ENTIRE BLDG.PE TO PREPARE REPAIR PLANS.REPAIR WORK TO START, UNDER PERMIT BY 11/11/19 AND BE COMPLETED BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF@87-26 TO 87-30 ON 10/14/19,SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WOOD FRAME IS LOAD BEAR.OWN RETAIN PE&CONTRCTR IMMED ERECT FENCE@EXP3 YARD,REMOVE UNSTBL EXP3 FAÇADE TO SAFE LEVEL,AS REQ TEMP WTR PROOF EXP3.WRK UNDR CONT PE.FILE JOB 2 DAY.DAILY REPT FEU |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:EXP3 WD FRAMG WALL LOAD BEAR.EXP3 FACADE TO BE REMOVED UNDR EMERG WRK CTRL #322128(101519FEU40803PN)DUE TO PART COLLAP WALL@2FL-ROOF AND BULG BRICK WITH INADEQ&CORRODED BRICK TIES.INTERIOR EXP3 WALL&CEILING FINISHES WERE CRACKED.OWNR RETAIN PE TO EVAL ENTIRE BLDG.PE TO PREPARE REPR DWGS.REPR WRK STRT UNDER PRMT BY 11/11/19 & BE CMPL BY 12/20/19 |
| Oct 15, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORD:EXP3 BRICK FACADE COLLAP@2FL TO ROOF@87-26 TO 87-30 ON 10/14/19.SURROUNDING BRICK UNSTBLE.INADEQ&CORRODED BRICK TIES.EXP3 WTR PROOF COMPROMISED.EXP3 WD FRAME IS LOAD BEAR.OWN RETAIN PE IMMD ERECT FENCE@EXP3 YARD.REMOVE UNSTBL EXP3 BRICK AS REQ.TEMP WATER PROOFEXP3 WRK UND CONT&DIR SUPV PE.FILE JOB W/IN 2 DAY STRT WRK.DAILY REPTS FEU |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Jun 6, 2014 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 3, 2013 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 3, 2012 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |