5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 22, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | BACKFILL EXCAVATION |
| May 21, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | BACKFILL EXCAVATION |
| May 20, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMER WRK:UNPERMITD EXCAVTN OBSRVD IN SIDE YRD@EXP#2 UNDRMING SIDEYRD/ DRIVEWAY. AN OPENING WAS ALSO OBSRVD IN THE FND WALL. REMEDY: COMPLY W CODE,.IMEDLY RETAIN NYS PE 2 PREPAR/SUPRVS PLANS4BAC KFIL&PERMNT RPR OF EXP#2FND WAL,SUBMT PLANS BY 5/21/24 |
| May 20, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT CELLAR LEVEL CREATED OPENING IN EXP#2 FOUNDATION WALL APPORX.4FTX4FT WITH APPORX. 9FTX5FT DEEP TUNNEL/SHAFT UNDER EXP#2 & DRIVEWAY, INSTALLED NEW REBAR, GAS LINE RUNNING ACROSS OPENING. AT EXTERIOR, EXP#2&3 INSTALLED PVC LINES FOR (5) SURFACE DRAINS RUNNING TO DRYWELL. NYSPE REPORT REQUEST. |
| May 20, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | NOTED AT CELLAR LEVEL CREATED OPENING IN EXP#2 FOUNDATION WALL APPORX.4FTX4FT WITH TUNNEL/SHAFT UNDERGROUND APPROX. 9FT IN LENGTH BY 5FT WIDTH & INSTALLED NEW REBAR. NO PERMIT ON FILE, STOP ALL WORK AT CELLAR LEVEL INCLUDING TUNNEL/SHAFT WORK AT DRIVEWAY SIDE. |