Queens Rego Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | MULTIPLE PANELS OF GLASS FACADE HAVE BEEN BROKEN BETWEEN 1/2025 & 7/20 26 PER ENGINEER'S REPORT SUBMITTED TO DOB INDICATING A SYSTEMATIC ISSU E ISSUE WITH GLASS FACADE.REMEDY:QEWI IMMEDIATELY EVALUATE ENTIRE GLAS S FACADE SYSTEM TO SUBMIT REPORT,SUBMIT NAMES OF 3 QEWI'S BY 9/28/2026 SUBMIT REPORT BY 12/14/2026 |
| Sep 3, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DAMAGED & BROKEN GLASS @ GLASS CURTAIN WALL EXHIBITING SIGNS OF POSSIBLE SYSTEM FAILURE INSTANCES OF BROKEN GLASS PANESL FROM MULT FLRS ON MULT EXPOSURES. REMEDY: IMMEDIATELY PROVIDE SIDEWALK SHED & ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLIC ON ALL PUBLIC RIGHT OF WAYS ACCESIBLE AREAS & COURTYARD |
| Jun 23, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED EXTERIOR TEMPERED GLASS PANE HAS BEEN DAMAGED & SHATTERED FALLING ONTO PUBLICLY ACCESSIBLE AREAS. NOTE: MULTIPLE TEMPERED GLASS PANES HAVE BEEN DAMAGED THROUGHOUT THE YEAR. |
| May 2, 2024 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |