Queens South Richmond Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 10, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT, OBSERVED AT CELLAR, 220V LINE HAS BEEN INSTALLED AS WELL AS OTHER ELECTRICAL THROUGHOUT CELLAR FOR SWITCHES, OUTLETS AND FIXTURES. AT TIME OF INSPECTION, THE WAS ONE WORKER PAINTING. APPROXIMATELY 80%-90% OF ALL WORK HAS BEEN COMPLETED. STOP ALL WORK, EXCEPT TO MAKE SITE SAFE. |
| Jul 10, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT CELLAR LEVEL, NO WALL PLATE COVERS HAVE BEEN PLACED AROUND ELECTRIC SOCKET RECEPTACLES AND LIGHT SWITCHES. |