Queens Hollis
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 15, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-AT TIME OF INSPECTION OBSERVED 2FL BALCONY CONC SLAB AT EX1 IS SAGGING, FILLER WOOD JOIST ARE IN BAD SHAPE,2 CATELIER STEEL BEAM AT EXP2 AND 4 ARE RUSTED, 2" GAP BTWN THE SPARATED CONCRETE SLAB AND THE FACADE AT EXP1 APPROX 1" SEPARATION BTWN THE BALCONY SLAB & SIDE PARAPET WALLS.REMDEY:REMOVE ALL COLLAPED 2FL BALCONY |
| Jul 15, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM. AT TIME OF INSPECTION OBSERVED:2FL BALCONY CONCRETE SLAB AT EXP1 IS SAGGING, FILLER WOOD JOIST ARE IN BAD SHAPE, TWO CARTILIER STEEL BEAMS AT EXP2 AND 4 ARE RUSTED, 2" GAP FOUND BETWEEN THE SEPARATED CONCRETE SLAB & THE FACADE. REMEDY: OWNER TO RETAIN A NYS PE TO PERFORM THE EMERGENCY REPAIR WORK, FILE A WORK PERMIT BY AUG. 16, 2022 |
| Jul 15, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL TIGHT BOARD FENCE APPROXIMATELY 22'LEFT, 20' FRONT, 22'RIGHT SIDE AT FRONT OF THE BUILDING EXPOSURE#1 TO SAFEGUARD THE PUBLIC AND PROPERTY |