DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 28, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 14, 2019 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | FULLY DEMOLISH BUILDING & EXTERIOR STEEL STAIRS.GRADE SITE |
| Mar 13, 2019 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WRK PERF W/OUT PMT BLD WAS REQ TO BE PART DEMO'D TO SAFE LVL PER COMM ORDER #022719FEU40401IK.COMM ORD&ADM CODE REQ'S THAT JOB/APPL BE FILED W/DEPT W/IN 2 DAYS OF COMMENCE OF WRK PER FIELD RPTS FROM OWN ENG WRK COMMENCE ON 3/6/19 PER DEPT RECORD NO JOB APPL HAS BEEN FILED WRK BY OWN CONT/ENG DOES NOT COMPLY W/COMM ORDER FSWO FILE APPL&OBT PERMIT |
| Mar 4, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE COND BLDG SUST DMG DUE TO FIRE ON 2/24/19. BLDG TO BE PART DEMO'D&TEMP ROOFED UNDER EMG WRK ORD,022719FEU40401IK WOOD JOIST& FLOOR/ROOF DMG@2ND ATTIC&ROOF LVLS WALLS@EXPS 2,3,4 AND THE ROOF&ATTIC JOIST@REAR OF BLDG HAVE PART COLLAP OWN HIRE PE&RA EVAL ENT BLDG&DEVEL COMP RPR PLNS FILE APPL TO RPR BLDG BY 9/1/19 BEG&COMPL WRK BY 10/1/19 |
| Feb 27, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMGWRK ORD:BLDG SUST EXTEN FIRE DMG ON 2/24/19 BLDG IS 2.75S+C STRUCT DMG TOOK PLACE@CENTER&REAR OF BLDG WHERE ROOF&EXP2&3 WALLS PART COLL 2FL JOIST DMG RISK OF PART COLLAP OF BLDG ENDANG PUB&ADJ PROP OWN IMM ENG PE&CONT TO PART DEMO BLDG TO SAFE LVL WRK U/CONT SUPV PE STRT PART DEMO N/L/THAN 2/29/19 FILE DEMO W/IN 2 DAYS OF COMM OF WKPROV RPT FEU |
| Feb 25, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROX. 150 LINEAR FEET OF CONSTRUCTION FENCE ALONG EXP#1 AND EXP#4 |
| Feb 24, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | .DUE TO FIRE |