Queens Woodhaven
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 23, 2016 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Aug 22, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER ORDER#311219 ISSUED ON 3/20/15 FOR EVALUATE THE ENTIRE BLDG&OBTAIN PERMITS FOR REPAIR/REPLACEMENT NO LATER THAN 4/6/15.PERMITS HAVE NOT BEEN OBTAINED AS OF 8/22/16.REMEDY: COMPLY WITH COMMISSIONER ORDER#311219 IMMEDIATELY |
| Jun 17, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 20, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FIRE OCCURED 3/18/15.BLDG HAS FIRE DAMAGE#1CEILING FINSIH @2FL EXPOSIN ROOF RAFTER#2ROOF RAFTER,WOOD PLANK &AWING CHARRED AT ROOF#3HOLES AT ROOF APP 3X3 AT FRNT OF BLDG.#4EXP.WOOD STUDS AT 1 & 2FL AT PARTY.WALL W/91-19 & 91-23 90ST.#5FRNT WALL @ 2FL HAS HOLES 4X4+/-)&WOOD STUD EXP OWNER TO ENGAGE NYS LICENSED PE ENG.TO INSPECT/EVALUATE ENTIRE BLDG |
| Mar 19, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |