Queens Woodhaven
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 20, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.@TIME OF INSPECTION,OBSRVD BLDG W/SEVERE FIRE DAMAGE@2NDFL REAR OF BLDG.APPRX REAR 30% OF ROOF SEVERELY CHARRED&IN DANGER OF FURTHER COLLAPSE.WNDWS OUT,SMOKE,FIRE,&WATER DMGE THRUOUT COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081224CFEU40902AK (CONTROL#341692) IMMEDIATELY |
| Aug 21, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD BLDG W/SEVERE FIRE DMG@2NDFL REAR OF BLDG.APPRX REAR 30% OF ROOF SEVERELY CHARRD&IN DANGER OF FRTHT CLLPSE.WNDWS OUT,SMKE,FIRE,&WATR DMGE THRUOUT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081224FEU40901AK (CONTROL# 341691)IMMEDIATELY |
| Aug 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.@TIME OF INSPECTION,OBSRVD BLDG W/SEVERE FIRE DAMAGE@2NDFL REAR OF BLDG.APPRX REAR 30%OF ROOF SEVERELY CHARRED&IN DANGER OF FURTHER COLLAPSE.WNDWS OUT,SMOKE,FIRE,&WATER DMGE THRUOUT OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/12/24.SGN OFF RPAIR PRMT |
| Aug 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD BLDG W/SEVERE FIRE DMG@2NDFL REAR OF BLDG.APPRX REAR 30% OF ROOF SEVERELY CHARRD&IN DANGER OF FRTHR CLLPSE.WNDWS OUT,SMKE,FRE,&WATR DMGE THRUOUT.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO IMMED EVAL THE ENT BLDG&INSTALL SHORNG, BRACNG,&TEMP WEATHRPRFNG AS REQ TO STBLZ |
| Aug 9, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING SUSTAINED WATER AND SMOKE DAMAGE, JOIST CHARRED, WINDOWS AND DOOR OUT , ROOF OPEN TO THE ELEMENTS DUE TO FIRE AND FIREFIGHTER OPERATION. |
| Aug 9, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT AT TIME OF INSPECTION OBSERVED BUILDING SUSTAINED WATER AND SMOKE DAMAGE, JOIST CHARRED, WINDOWS AND DOOR OUT , ROOF OPEN TO THE ELEMENTS DUE TO FIRE AND FIREFIGHTER OPERATION. VACATE ENTIRE BUILDING. |