NYC Building Report

Queens Glendale

89-40 Metropolitan Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Mar 9, 2023 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT APPROXIMATELY 575 LINEAR FEET OF TIGHT BOARD FENCE 15' FROM BUILDING FACADE AT ALL EXPOSURES ( ENTIRE PERIMETER)
Mar 8, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMER WORK.BLDG SUFFERED A 4-ALARM FIRE ON 3/8/23&SUSTAINED STRUCTURE DAMAGE.APPROX 50% OF ROOF PARTIALLY CLLPSD.APPRX 75% OF ROOFFIRE DMGED.CRCKS&DSPLACED MASONRY OBSRVD@EXTERIOR WALLS.1.IMMED INSTLL TGHT BOARD FENCE ALL AROUND BLDG TO ENCLOSE 15FT OF SDWALK@EXP1,EXP4,& ENCLOSE 6FT OF SDEYARD@EXP2
Mar 8, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK-BLD SUFFERED STRUCT FIRE DMG.APPRX50'ROOF COLLPSD.APPRX 75'FIRE DMG ROOD W/MULTPL OPEN HOLES,CRKS,BUKLD MASONRYAT EXT WALLS ENTIR EXP4 WALL PART COLAPSED.IMMED FULLY DEMO BLDG.ALL WRK PE SUPRVSD DEMO-ENDORS CONTRCT DEP HAZMAT PROCDUR.SUBMT PE NAME&REG.SUBMT M&M DAILY REPORTS
Mar 8, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVERE FIRE, WATER AND SMOKE DAMAGE THOUGHT-OUT STRUCTURE, WHERE EXPO#2 MASONRY WALL & ROOF HAS PARTIALLY COLLAPSED. EXPO#3/4 SEVERE STEP CRACKING AT CMU BLOCK WALL WITH SEPARATION DUE TO FIRE.
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED