NYC Building Report

Queens Woodhaven

88-29 80 Street, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

3 records

Date Status Type Summary
Feb 19, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ATOI OBSERVED 2 MEN WORKING AT THE EXP 2. INSTALLING SHINGLES IN THE ROOF. HOWEVER, NOTICED A SHED BUILT USING A CMU BLOCK AND WOOD, WITH APPROX SIZE OF 12' H X 20'W X 20' L. ALSO NOTICED CMU WALL BUILT AT EXP 2 AND 3 EXCEEDED THE HEIGHT REQUIREMENTS, APPROX HEIGHT IS 15' FT. NO PERMIT FILED FOR THE SCOPE OF WORK WITH THE DEPT.
Feb 19, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ATOI OBSERVED 2 MEN WORKING AT THE EXP 2. INSTALLING SHINGLES IN THE ROOF. HOWEVER, NOTICED A SHED BUILT USING A CMU BLOCK AND WOOD, WITH APPROX SIZE OF 12' H X 20'W X 20' L. ALSO NOTICED CMU WALL BUILT AT EXP 2 AND 3 EXCEEDED THE HEIGHT REQUIREMENTS, APPROX HEIGHT IS 15' FT. NO PERMIT FILED FOR THE SCOPE OF WORK WITH THE DEPT.
Jul 10, 2000 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL