Queens Richmond Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE TIME OF INSPECTION OBSERVED, GUT RENOVATION THROUGHOUT THE FIRST FLOOR. REMOVED ALL THE FIRE STOPPINGS EXPOSING THE WOOD MEMBERS OF THE BUILDING. NO PERMIT FOR THIS JOB AT THE TIME OF INSPECTION. |
| Nov 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE TIME OF INSPECTION OBSERVED GUT RENOVATION THROUGHOUT THE FIRST FLOOR. REMOVED ALL THE PLUMBING ALONG WITH THE PLUMBING FIXTURES. INSTALL THE NEW PVC PLUMBING PIPING. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION. |
| Nov 12, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE TIME OF INSPECTION OBSERVED, GUT RENOVATION THROUGHOUT THE FIRST FLOOR. REMOVED ALL THE ELECTRICAL WIRING HANGING DOWN LOOSE ALONG WITH THE ELECTRICAL FIXTURES. NO PERMIT FOR THIS JOB AT THE TIME OF INSPECTION. |