Queens Far Rockaway-Bayswater
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 9, 2013 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | DUE TO SEVERE WEATHER CAUSED BY HURRICANE SANDY. THE FOLLOWING DAMAGES OCCURED. DAMAGED BOILER AND HOTWATER CAUSED BY FLOODING REPLACED WITH ONE WEIL MCLAIN BOILER AND ONE G.E. HOTWATER HEATER ON THE 1ST FLOOR REMEDY: MAKE ALL NECESSARY REPAIRS AND OBTAIN ALL REQUIRED PERMITS WHERE APPLICABLE. MUST OBTAIN PERMIT WITHIN 60 DAYS |