NYC Building Report

Queens Ozone Park (North)

78-19 101 Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Jan 6, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM:DUE TO 4 ALARM FIRE ON 1/5/20.BLDG SUFFER FIRE DMG AS FOLLOW:2FL FRAME MOD FIRE DMG@THE MIDDLE PORTION OF BLDG.ROOF HAD SEVERED HOLES FAÇADE@FRNT & SIDE OF BLDG HAD SIDE MISSING.BLDG OPEN TO WEATHER AND UNAUTHORIZED ENTRY.OWNER HIRE NYSPE&ENDORSED CONTRCT EVALU THE WHOLE BLDG.OBTAIN PRMTS FOR REPRS N/L/T 3/16/20.SIGN OFF JOB N/L/T 6/15/20
Jan 6, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WORK ORDER: DUE TO 4 ALARM FIRE ON 1/5/20 BLDG SUFFER DAMAGE AS FOLLOW:2FL FRAME MOD FIRE DAMAGE@MIDDLE PORT OF BLDG.ROOF HAD SEVERAL HOLES.FACADE @FRNT&SIDE OF THE BLDG HAD SIDING MISSING.BLDG IS OPEN TO WEATHER&UNAUTHORIZED ENTRY.OWNR IMMED HIRE PE&ENDORSED CONTRCT TO EVAL WHOLE BLDG&SEAL OPENGS TO THE PREMISE.FILE PRMT WITHIN 48 HRS OF WORK
Jan 5, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Jun 1, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jul 19, 2000 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL