Queens Ozone Park (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 6, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:DUE TO 4 ALARM FIRE ON 1/5/20.BLDG SUFFER FIRE DMG AS FOLLOW:2FL FRAME MOD FIRE DMG@THE MIDDLE PORTION OF BLDG.ROOF HAD SEVERED HOLES FAÇADE@FRNT & SIDE OF BLDG HAD SIDE MISSING.BLDG OPEN TO WEATHER AND UNAUTHORIZED ENTRY.OWNER HIRE NYSPE&ENDORSED CONTRCT EVALU THE WHOLE BLDG.OBTAIN PRMTS FOR REPRS N/L/T 3/16/20.SIGN OFF JOB N/L/T 6/15/20 |
| Jan 6, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK ORDER: DUE TO 4 ALARM FIRE ON 1/5/20 BLDG SUFFER DAMAGE AS FOLLOW:2FL FRAME MOD FIRE DAMAGE@MIDDLE PORT OF BLDG.ROOF HAD SEVERAL HOLES.FACADE @FRNT&SIDE OF THE BLDG HAD SIDING MISSING.BLDG IS OPEN TO WEATHER&UNAUTHORIZED ENTRY.OWNR IMMED HIRE PE&ENDORSED CONTRCT TO EVAL WHOLE BLDG&SEAL OPENGS TO THE PREMISE.FILE PRMT WITHIN 48 HRS OF WORK |
| Jan 5, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Jun 1, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 19, 2000 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |