Queens Ozone Park (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 6, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:DUE TO 4 ALARM FIRE ON 1/5/20 BLDG SUFFERED FIRE DMG AS FOLLOW: STAIR FROM 1-2 FLRS MOD FIRE DMG.ROOF JOIST@REAR OF BLDG WERE FIRE DMG 2FL JOIST EXPOSED&LOCALY FIRE DMG.ROOF HAD SEVERAL HOLES.FACADE@FRNT & SIDE OF BLDG HAD SIDING MISSING.BLDG IS OPEN TO WEATHER&UNAUTHORIZED ENTRY.OBTAIN PRMTS FOR REPRS N/L/ 3/16/20.SIGN OFF JOB N/L/ 6/15/20 |
| Jan 6, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:DUE TO 4 ALARM FIRE ON 1/5/20 BLDG SUFFER DMG AS FOLLOW:STAIR FROM 1-2 FLRS MOD FIRE DMG.2FL JOIST EXPOSE&LOCALY FIRE DMG.FACADE@FRNT&SIDE OF BLDG HAD SIDING MISSING.BLDG OPEN TO WEATHER& UNAUTHORIZED ENTRY.OWNR IMMED HIRE PE&ENDORSED CONTRCT TO EVALU WHOLE BLDG&SEAL ALL OPENGS TO THE PREMISES.FILE PRMT WITHIN 48 HOURS OF WORK |
| Jan 5, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |