Queens Middle Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 12, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:EXP1 MASN WALL WAS PARTIALLY COLLAPSED,CRACKED, DETERIORTED AT 2ND FLR UP TO PARAPET.EXP1 WAS STRUCTLY COMPROMISED AND AT RISK FURTHER COLLAPSE,WHICH REPRESENTS A DANGER TO THE PUBLIC.OWNER ENGAGE NYSPE&LIC'D CONTR TO IMMD REMV/BRCE/STABLZE EXP1.PE SUBM MEANS& MTHDS RPTS W/PHOTOS FEU.WRK U/PE.FILE 2DAYS.INSTL TMP WEATH PROOF@EXP1 |
| Nov 24, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISH ORDR#337390(072020FEU40501PN)DATD 07/20/20 REQ BLDG OWNR TO RETN NYSPE TO EVAL ENTRE BLDG&PREPARE REPR DRWGS.BLDG REPRS RELATED TO PARTLY COLPSED EXP1 PARAPET&DETERIOR ROOF WERE REQ TO BEGN UNDR PRMT BY 8/17/20&BE COMPLTD BY 9/25/20 AS OF 11/24/20,NO JOBS TO RPR BLD WERE FILE.IMMD COMPLY W/COMMISH ORD#337390 072020FEU40501PN |
| Sep 30, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 30, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 20, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG SAFE CONDN:PARAPT&2ND FLR FACDE@EXP1 PART COLPSD.APRX 15'WX5' TALL REMAIN FACADE BULG&AT RISK COLAP.BACK UP BRCK DETER MORTR JOINTS& LOSE BRCKS THR-OUT.ROOF TEMP NON ENG'R,INDAQ TARP.1FL APRX 1'DX8' WIDE OPENG ALNG EXP1 WALL.OWNR RETN PE&LIC'D CONTR.PE EVALU ENTRE BLDG&PREP REPR DRWGS.BLDG REPR'D UNDR PRMT START BY 8/17/20 & COMPLT BY 11/30/20 |
| Jul 10, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | EXTEND THE SIDEWALK SHEDS (OVERHANG) AN ADDITIONAL 5 LINEAR FEET AT LEFT SIDE AND AN ADDITIONAL 5 LINEAR FEET AT THE RIGHT SIDE. INSTALL ADDITIONAL OUTRIGGERS AT FRONT OF SIDEWALK SHED TO COVER COLLAPSE ZONE ALSO REMOVE ALL FALLEN MASONRY DEBRIS FROM THE TOP OF THE SIDEWALKSHED DECK & INSTALL ADDITIONAL STEEL DECKING TIGHT UP AGAINST THE BUILDING |
| Oct 31, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 22, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 30, 2018 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | INSTALL APPROX.40 LINEAR FEET OF SIDEWALK SHED ALONG FRONT OF BUILDING (EXP#1) TO SAFEGUARD PUBLIC & PROPERTY |
| Aug 9, 2011 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |