70-72 Kissena Boulevard, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

22 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Mar 3, 2015 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
Jan 1, 2012 V-DOB VIOLATION - ACTIVE BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
May 3, 1999 V-DOB VIOLATION - ACTIVE Z-ZONING NONE Z-ZONING NONE
May 3, 1999 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 10, 1992 VP*-VIOLATION UNSERVED ECB- DISMISSED B-BOILER BOILER OPTIONAL B-BOILER BOILER OPTIONAL
Aug 6, 1990 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL JD