Queens Ridgewood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| May 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BASEMENT LEVEL EXCAVATION BEING DONE BY HAND TOOLS AND CHIPPING GUN, ALL CONCRETE REMOVED & SOIL 5-7IN REMOVED, BEING PUT IN BAGS, AND REMOVED. ALSO, OPEN ELECTRICAL PANELS, OUTLETS, SWITCHES, AND LIGHTS. ALONG WITH OPEN AND PLUMBING DRAINS MADE OF PVC AND COPPER WATER LINES. |