NYC Building Report

Queens Glendale

66-08 Central Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Mar 22, 2023 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL SIDEWALK SHED 18 FEET AT EXPOSURE#1 (FRONT)
Mar 22, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN. OBSERVED A 2 STORY BRICK BUILDING, THE FRONT BRICK FACADE AND PARAPET WALL ON THE CENTRAL AVE SIDE OF BUILDING IS CRACKED HORIZONTALLY AND VERTICALLY.
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED