7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Oct 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DETAILS ON APPROVED/AMENDED STRUCTURAL PLANS CONFLICT AS TO INTENDED R EMOVAL/REPLACMENT OF FIRST FLOOR EXISTING JOISTS TO REMAIN VS NEW JOIS T (C JOIST) INSTALLATION ELEVATION OF CELLAR NOATED AS 9'0" BELOW FIRS T FLOOR 0'0" ACTUAL DIMENSIONS APPROX 89 INCHES CELLAR TO 1ST FLOOR DE CK AND 5'9" CELLAR REMEDY: AMEND PLANS FOR CORRECT AND LEGAL CONDITION |
| Sep 8, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROV ED AMENDMENTS NOTED AT TIME OF ISNPECTION ELEVATIONS ARE NOT CORRECT THERE IS APPROX 3FT DIFFERANCE ON BETWEEN 3RD FLOOR AND ROOF ELEVATION OF APPROX 3FT AT TIME OF INSPECTION STRUCTURAL PLANS WERE NOT ON SITE REMEDY:CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS JOB#410150134 |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |