NYC Building Report

Queens Maspeth

54-53 63 Place, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Sep 9, 2013 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 7, 2010 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 22, 2010 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 22, 2010 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 15, 2009 V*-DOB VIOLATION - DISMISSED LL16-LOCAL LAW 16/84 - ELEVATOR ELEVATOROPTIONAL INADEQUATE DETAILS ON APPROVED PLANS FOR FIRE DIVISION AT MASONRY PART Y WALL FLOOR JOINT INSTALLATION. DETAIL ALSO MISSING FOR ANOHORASE OF MASONRY WALLS TO FOUNDATION REMEDY: SUBMIT SHOP DRAWING, STAMPED AND SIGNED AND DATED OF JOINT LA YOUT/FIREDIVISION AND FOR WALL ANCHORAGE DETAILS
Jun 8, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MISCELLANEOUS VIOLATIONS FAILURE TO NOTIFY DOB WITHIN 24-48 HOURS OF T HE START OF EXCAVATION NOTED: OBSERVED AT TIME OF INSPECTION FOOTINGS AND EXCAVATION STARTED NO NOTIFICATION GIVEN TO DOB OF START REMEDY: S TOP ALL WORK ENTIRE SITE COMPLY WITH NOTICE OF VIOLATION OFFICALLY NOT IFY DOB BY CALLING 212 227-4416 AND OBTAIN NOTIFICATION NUMBER CALL FO
Jun 8, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MISCELLENOUS VIOLATIONS FAILURE TO NOTIFY DOB WITHIN 24-48 HOUR NOTICE OF THE START OF EXCAVATION NOTED: OBSERVED AT TIME OF INSPECTION FOOT INGS AND EXCAVATION STARTED NO NOTIFICATION GIVEN TO DOB OF START REMEDY: STOP ALL WORK ENTIRE SITE COMPLY WITH NOTICE OF VIOLATION OFFI CALLY NOTIFY DOB BY CALLING 212 227-4416 AND OBTAIN NOTIFICATION NUMBE