Queens Sunnyside
51-55 Garage 48 Street, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 17, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.REAR WALL OF GARAGE IN STATE OF DISREPAIR WALL HAS OPEN JOINTS&DTERIORATD BRCKS IN MULT LOCATNS THROUGHOUT AREAS OF OUTWRD DSPLCD BRCKS@REAR WALL PLANT GRWTH@REAR&SOUTH SIDE WALL.THIS COMPLAINT WAS HANDLED BY FEU,PLEASE SEE COMPLAINT 4A13271 FOR FURTHER INFORMATION |
| Sep 17, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.REAR CMU WALL OF GARAGE IN STATE OF DSRPAIR.GARAGE REAR WALL HAS CRCKS,OPEN JOINTS,&BRKN CMU BLOCKS IN MULT LOCATIONS THROUGHOUT WALL.PLANT GRWTH FRM ROOF&REAR WALL.1.IMMED SEAL FRNT OPENINGS,2.NYSPE STRCT ENG TO IMMED ENT GARAGE&DSGN RPAIRS,3.FILE FOR RPAIRS BY 11/17/25 |
| Sep 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED REAR WALL OF THE GARAGE IN STATE OF DISREPAIR, SHIFTED CMU BLOCKS, AND MISSING MORTAR. ENGINEERS REPORT REQUESTED |
| Sep 16, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED GARAGE REAR WALL IN STATE OF DISREPAIR,HAVE CRACKS ,CMU BLOCKS SHIFTED. ENGINEERS REPORT REQUESTED. |