Queens East Flushing
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ATOI, OBSERVED TEMPORARY ELECTRICAL ON WALLS AND CEILINGS FOR TEMP. POWER, LIGHT AND SWITCHING IN FIRE DAMAGED HRP ELIGIBLE PROPERTY. DOB NOV ISSUED. |
| Sep 10, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION, OBSERVED INTERIOR WALLS AND CEILINGS DEMOLISHED AND REMOVED THROUGHOUT WITH NO PERMIT ISSUED FOR THIS WORK. |
| Aug 15, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CNDITN.2.5STRY&CELLAR,SEMI-DTACHED, WOOD FRAME,APPRX 16FTW X 45FTD,EXP2 SHORES A PARTY WALL W/45-32.BLDG SUFFRD A FIRE ON 8/9/24.REAR HALF OF ROOF WAS FIRE DMGD.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIRS W/DOB.RPAIR BLDG UNDR PRMT STRTNG BY 10/7/24,&CMPLTD/SGND OFF 12/6/24 |
| Aug 12, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL FIRE DAMAGED OPENING TO PROTECT THE PUBLIC AND PROPERTY |
| Aug 9, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE, CAUSING EXTENSIVE SMOKE AND WATER DAMAGE THROUGHOUT WITH CHARRING TO STRUCTURAL MEMBERS AT ROOF LEVEL. THE ROOF IS OPEN TO THE ELEMENTS AND UNSAFE TO OCCUPY. |