Queens Sunnyside
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | RETAINING WALL AT REAR YARD COLLAPSED APPROXIMATELY 40 FEET WIDTH BY 5 FEET HEIGHT AND FELL INTO ADJACENT PROPERTY REAR YARD. COLLAPSED RETAINING WALL REMOVED SOIL AND FOUNDATION MATERIAL FROM UNDER REAR YARD PAVING CAUSED A 40 FEET CRACK IN REAR YARD PAVING. DOD VIOLATION ISSUED. |