Queens Long Island City-Hunters Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
20 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 24, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 24, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 24, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 24, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 16, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Sep 5, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 16, 2018 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 7, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | RE-INSTATED DOB VIO, DISMISSED IN ERROR DUE TO CONCRETE BLOW-OUT ON 6/26/17 AT THE 8TH FLOOR SLAB, MR. YUBUN ANYEUNG (FILED EOR) WAS ASKED TO SUBMIT 1. COLUMN REPAIR DETAIL AND 2. COLUMN REPAIR LOCATION PLAN TO CEU FOR REVIEW. SUBMIT ALL REQUIRED DOCUMENTS TO CEU |
| Dec 7, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CONCRETE BLOW-OUT ON 6/26/17 AT THE 8TH FLOOR SLAB, MR. YUBUN ANYEUNG (FILED EOR) WAS ASKE TO SUBMIT 1. COLUMN REPAIR DETAILS AND 2. COLUMN REPAIR LOCATION PLAN TO CEU FOR REVIEW. SUBMIT ALL REQUIRED DOCUMENTS TO CEU |
| Jul 28, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MATERIALS TEST REQUIRED. TEST TO START NO LATER THAN 8/7/17 AND THE REPORT TO BE SUBMITTED NO LATER THAN 8/15/17 |
| Jun 27, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CONCRETE BLOW-OUT ON 6/26/17 AT THE 8TH FLOOR SLAB THE ENG OF RECORD, THE DEVELOPER AND THE SPECIAL INSPECTOR ARE REQUIRED TO SUBMIT ALL DOCUMENTS TO CEU BEFORE 6/30/17 |
| Jun 27, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CONCRETE BLOW-OUT ON 6/26/17 AT THE 8TH FLOOR SLAB THE ENG OF RECORD, THE DEVELOPER AND THE SPECIAL INSPECTOR ARE REQUIRED TO SUBMIT ALL DOCUMENTS TO CEU BEFORE 6/30/17 |
| Jun 27, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CONCRETE BLOW-OUT ON 6/26/17 AT THE 8TH FLOOR SLAB THE ENG OF RECORD, THE DEVELOPER AND THE SPECIAL INSPECTOR ARE REQUIRED TO SUBMIT ALL DOCUMENTS TO CEU BEFORE 6/30/17 |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Apr 6, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WAS ONGOING CONTRARY TO THE SITEHAVING A FULL STOP WORK ORDER ISSUED ON 7/30/15 |
| Jul 30, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |